NormaHelp

Modules · For the quality manager

Revising a document already in force

How the work moves

Revision change
  1. 1Open new revision
  2. 2Update and review
  3. 3Make effective
  4. 4Supersede old revision

Open: Documents > Document Control. Typical leads: Quality Manager and Document Controller; engineers and department managers can perform permitted document work. Purpose: keep an identifiable, approved revision in force and retain its history.

Prepare and approve a revision

A document record: the lifecycle rail (Draft, In review, Approved, Effective, Periodic review, Revised / retired), each revision with its approvals, the Ownership rail with the review interval, and the Overview, Evidence, Linked records and Activity tabs.
A document record: the lifecycle rail (Draft, In review, Approved, Effective, Periodic review, Revised / retired), each revision with its approvals, the Ownership rail with the review interval, and the Overview, Evidence, Linked records and Activity tabs.

  1. Choose Create revision. Enter a unique revision label, up to eight characters using letters, digits, dots, or dashes and beginning with a letter or digit. Labels are normalized to uppercase.
  2. For a later revision, enter the required change summary. Explain what changed in language an approver can assess.
  3. Attach the revision file using Attach file, up to 25 MB. Confirm its filename and hash after upload.
  4. If the revision supports in-app text authoring, open Edit, revise the Markdown text, inspect the preview, and save. Use Markdown headings, lists, and tables for structure. The editor is a document-content editor, not a replacement for Word's layout tools.
  5. Add the required approvers by email and, optionally, the role or capacity in which they approve. At least one approver is required, and it cannot be you: as the form says, an author cannot approve their own revision, and the signature is refused if they try. The role is free text that appears on the signature exactly as typed, so agree the wording once.
  6. Choose Send for review. The ordinary UI requires both a file and at least one approver.
  7. Each named approver reviews the exact file and change summary, then signs their own line with password verification and an approval or rejection meaning.
  8. When all required approvals are positive, choose Mark approved. Approval and effectivity are separate steps.
  9. An authorized quality manager or administrator chooses Make effective, enters the effective date, chooses Retraining required — everyone re-reads this revision or No retraining required — prior reading stays current, and submits Set effective date.

Confirm that the intended revision is Effective and that the former effective revision is Superseded with a named successor. The previous effective file remains the controlled version while a successor is being drafted or reviewed. A date recorded during effectivity is evidence of the declared effective date; inspect the state rather than assuming an unsubmitted date schedules a background release.

Revision states

State Meaning and next work
Draft Prepare content, file, change summary, and approvers
In review Named approvers review and sign; return to draft where permitted
Approved Required positive approvals exist; authorized user makes effective
Effective Revision currently in force
Superseded Replaced by the identified successor
Obsolete Withdrawn without a replacement through the permitted withdrawal action

Record a periodic review

When review is due and no open revision takes priority, an authorized reviewer or the document's owner may see Record periodic review.

  1. Open the effective document and compare it with the actual process, current references, and known changes.
  2. Choose Still current — no change needed or Needs revision — start the next revision.
  3. Write what you checked and found, within the 280-character note limit, and submit.
  4. Confirm the review event and updated review due date. Both outcomes restart the review clock. The needs-revision outcome creates the next draft when a next label can be derived.

A periodic review can therefore provide evidence without forcing a no-change revision. If there is an unfinished revision, finish its workflow first. If the app cannot derive your next revision label, create and name the revision manually.

Example: WI-2208 is due for its annual review. The supervisor opens the effective file, walks the operation with it, and records Still current — no change needed with the note "Walked op 020 on job 4581 on 2026-09-14 with the instruction in hand; steps, gages and limits match." That note is the review evidence; the clock restarts without a pointless Rev F.

Reading and training impact

During effectivity, the app shows the affected reading population when requirements exist. Choose Retraining required to make assigned people read the new revision, or No retraining required with a rationale. The latter preserves eligible prior current reading; it does not make an already overdue person trained. Review the Training matrix after release.

On an effective document assigned to you, I've read Rev … records your own reading. Read the file before selecting it. Approval of a document and completion of reading are separate records.

In the user guide

This article is part of chapter 9, "Document Control", of the NormaQMS User Guide (NORMA-UG-001), which is under Help > User guide. Chapter numbers in the text refer to that guide. The same chapter also covers: Create a document identity; File and approval controls; Evidence to check.