First article and inspection planning

How the work moves

Inspection plan
  1. 1Define characteristics
  2. 2Set method and equipment
  3. 3Record results
  4. 4Resolve failures

Identification Traceability and Inspection Planning: first article and inspection planning. This is part of chapter 23 of the NormaQMS User Guide.

First Article and Inspection Planning

Open: More > First Article & Inspection Planning. Typical preparers: Engineer and Quality Manager. Release authority: Quality Manager or administrator.

An inspection plan: one row per characteristic with requirement, method, equipment, sampling and classification.
An inspection plan: one row per characteristic with requirement, method, equipment, sampling and classification.

  1. Create a plan with title, product reference, and revision. Add a configuration reference when applicable.
  2. Add each characteristic with its number, requirement, method, and classification. These identify what is checked and how.
  3. Include tolerance, equipment reference, sampling, and frequency where relevant. Sampling defaults to 100% when not otherwise supplied by the supported workflow.
  4. Use Major, Minor, or Key classification as appropriate to your defined system.
  5. Inspect the full characteristic list before release. At least one characteristic, a product reference, and a revision are required.
  6. The authorized user selects Release and confirms the released status.
Characteristic detail Example
Number 12
Requirement and tolerance Hole diameter; 10.00 ±0.05 mm
Method and equipment Bore gauge; asset BG-012
Sampling and frequency 100%; every completed bracket
Classification Key, if designated under the shop's requirements

A released plan defines the inspection. It is not itself a completed first-article report or a record of measured results. Record actual results in Production & Process Control or the controlled evidence required by your process. Characteristics cannot be quietly edited after release; use a new controlled plan or supported supersession process when the definition changes.

In the user guide

This article is part of chapter 23, "Identification Traceability and Inspection Planning", of the NormaQMS User Guide (NORMA-UG-001), which is under Help > User guide. Chapter numbers in the text refer to that guide. The same chapter also covers: Identification and Traceability.